What are your prices?


Our prices are subject to change depending on supply and other market factors.  We will send you an updated price list after your company contact us for further information.

Which regions are your products mainly sold in?


Our products are mainly exported to over 30 countries such as the USA, Canada, Colombia, Germany, Japan, Spain, Italy, UK, Korea, Australia, India and etc.

How long can I receive feedback after we ask?


We will reply you within 12 hours in working day.

What products can the company provide?


Products cover slurry pump, dredging pump, water pump, sewage pump, etc., can meet the mining, metallurgy, non-ferrous metals, power plant ash removal, power plant desulfurization and other industries containing solid particles of material transport.

How to ensure the quality of the product?


We have a strict quality control system, with quality checkpoints in each workshop and special personnel responsible for inspection and control of key processes.

Are you a direct manufacturer or a trading company?


We have our own physical factory, and we also have our own sales department. We produce and sell ourselves.

Can you make customized products?


Yes, we can provide comprehensive services in material development, product design, mold design and manufacturing, performance testing, and the entire process. The product development design and process preparation all adopt CAD, CAPP new technology.

What is the payment method?


When we quote for you, we will confirm with you the way of transaction, FOB, CIF, CNF, etc.

For mass production goods, you need to pay a 30% deposit before producing and70% balance against a copy of documents. The most common way is by T/T. L/C is also acceptable.

Do you guarantee safe and secure delivery of products?


Yes, we always use high quality export packaging.  We also use specialized hazard packing for dangerous goods and validated cold storage   shippers for temperature sensitive items.  Specialist packaging and non-standard packing requirements may incur an additional charge.

What is the average lead time?


For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times become effective when we have received your deposit, and we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so.

< 1 >

Inquiry

%{tishi_zhanwei}%